Preparing video...
0:00 / 0:00
Imperial marble & Granite craftsmanship
17,668 views
What does it take to create a landmark/ future icon/masterpiece/perfection/ a project of this scale
Comments
Transcript
Auto-generated transcript. Not time-synced to the video.
what you see here was not made with machines
this is handcrafted
piece by piece, all made by hand
Masterpiece
we believe that when Mashiach will come, every shul will go up to Eretz Yisrael
when you build a shul in today’s style - a 2020 style
when Mashiach will come it’s going to be a problem
because you’re going to take this building and put it in Eretz Yisrael
it won’t look like it belongs there
so when you spend this kind of money on such a project
and the ownership wanted this building to be next level
so we designed it in a way
it should fit IY”H
when it needs to go up
I traveled a lot to Eretz Yisrael
to dream and brainstorm
together with Hershy
And of course Shmily from our team
the design has a lot of European style
the color is Eretz Yisrael style
you walk in and it has this ten star hotel feel
but in a holy Beis Medrash version
especially all the psukim that are on the walls
this gives you a very, very warm
very rich, but very warm at the same time
I believe that when you build something timeless
even though the architecture needs to be from the past
the design needs to be new
so every part the architecture, the structure of it is historical
but the design part, sometimes it’s the handle
sometimes it’s the updated color
that brings it together that the design should feel new
the idea is
it has to be very, very, very rich feel
otherwise you didn’t accomplish anything
sometimes people want a rich look
and it’ll be too gaudy, too much
we didn’t want it to be too much
we wanted it to be in a way minimalistic
when you go minimalistic,
and you don’t have the right material,it's going to look dead
you need to have the balance between minimalistic
and at the same time extremely rich
-1:57
Jerusalem stone gives you that feel
I saw that this building,
this Beis Medrash
is going to be something
it’s going to be a new landmark
normally a landmark is a few hundred or thousand years old
this… we’re going to build a new landmark
and stone was going to be the scope
when I first got the phone call from the designer
R’ Meilech Raab,Raab Interiors
in general, he is well known to have very unique ideas
and I’ve done all kinds of projects already
Beis Medrash, fireplaces, Aron Kodesh…
here was a project that needed
an enormous amount of stone
and every area needs the color
of the stone to naturally give out a different shade of color
so the minute I heard that they want Jerusalem stone
I immediately connected to the project
my younger years I was in Eretz Yisrael
so I understood what they were talking about
I then started looking at where I can find
this much
consistent, it’s very hard to find this much stone
and of the best quality
at first all the stone was overseas
It was being cut
I went there to see how it’s being cut
we needed to make a lot of changes
sort through the waste
some material was disqualified
carefully selected other material
then the work by hand began
we’re talking here about handcrafted stone
what you see here was not made with machines
this is handcrafted piece by piece, all made by hand
Jerusalem stone comes from
the hills around Jerusalem
and every area has different colors
and it’s unpredictable
you can’t know ahead of time
what it will look like
when you cut stone, you don’t know before what’s inside
there are a lot of natural holes in the stone that you can’t use
you need to break off a piece of stone, polish it by hand
I took a piece of stone and the first thing I did
was slice of one slab of stone
every area of this building
from when the stone came off the mountain
we knew exactly where it was going to go
thousands of square feet of stone
every stone that you see
you walk up the steps in the Beis Medrash
it was cut a specific way to give a certain effect
then in the main hall of the Beis Medrash
we took at the beginning 20 slabs of stone
and cut it in a vein cut,like the block was cut
- 3:59
and then I told them to turn around the block and cut the other way it should give a different
effect
I’m the project manager on this project
I got involved from the pre-planning
before foundation
once we figured out we wanted to go with stone
that’s when we started looking
shopping around for people who can handle such a large project
that’s when we figured out that Imperial is actually
the big guy for this kind of situation
the uniqueness of this job was
everything… every single piece over here, is one piece of stone
heavy, beautiful stones
it’s not a simple thing
everything needs to be reaccounted
Structurally-wise this weighs a lot more than any other building
the framing for this the structures that will be able to hold these stones
we had to bring in steel guys
from all over upstairs for the Aron Kodesh
there was so much involved calculating if it’s strong enough to hold the stones or not
all of this was the unique and challenging part of this project
and the fun part also of this project I would say
we got a design for the library very late in the game
and… we weren’t sure if we’ll have something
maybe some painted sheetrock
but Imperial pulled through in a matter of weeks
from bringing stone importing, expediting
everything that normally takes months and months of coordination
took literally like weeks and they executed to perfection
a ton of effort when into this
Very, very… there were nights
that the Imperial team worked every day until 10 at night non-stop
there were crews there at 7amthey rotated, left at 5pm
brought a new crew until 10 pm
just to make us and the customer happy and the goal happy obviously
I got a phone call from Meilech Raab
that he’s planning to build a major project
a Beis Medrash that the world has never seen before
for the renowned Chassid and philanthropist R’ Yoel Landau
And he wants me on his team
you’re talking here about very unique stones
both in quality and in quantity
and the weight of the stone that needs to be handled
there probably isn’t a company here locally that ever did something like this
and they wanted someone with experience not someone who will learn on the job
that’s why I stepped in and took the lead with the full responsibility
it took several months to understand the design
and to review the weight of the stones
and the logistical aspect of the stones
what comes first and second and so on
what size brackets
what kind of enforcements are needed
the Aron Kodesh has stones that weigh a 1000 lbs
we first brought a sample, installed it
and then broke it
it was important to see how hard it is to take apart these stones
to understand and see if it will hold well
you can say that in this building no synthetic or fake materials were used
everything is made with stainless steel
measured, expensive, and powerful enforcement
in this place we used natural materials
meaning to say, when you use natural materials
you can’t go wrong
this alone gives the entire impression of the job
you don’t need an excuse why it’s beautiful
it’s not the LED lights or something else
it’s the natural beauty of it all
when you walk in and see such a stone straight from nature
measured from the mountain for this
you can’t go wrong
no one has managed to do this before
this was made by following historical architecture
no one just made something up themselves
made up a new design
take cornices and crowns and turn it like a triangle or diamond
because someone decided that this is nice
this design follows historical architectural books
when you go with the rules, you can’t go wrong
It’s personally satisfying to see that
B”H everything is as it should be
it all flows and is a success BH, only with Siyata D’Shmayah
there’s no greater pleasure than this
the Aron Kodesh has what’s called Corinthian capitals
the four columns have on top of it a crown
this crown weighs about 600 - 700 pounds
this crown is designed like a typical
crown that existed during Bayis Sheini in the Beis Hamikdash
and I showed the designer a
template of it that was found
in the old city of Yerushalayim
and I told him; identical, this is the design
this is what you should follow and you have a historical basis
if someone asks; what's this design?
you can show him this is it, it comes from somewhere
I can’t think of another company
not only within our heimishe community
but in general any local company
That could have handled this job
my name is Yossi Brill and I work for Imperial Marble and Granite
I’m working at Imperial for close to 8 years
I got involved in this project
Hershy tells me one day we have a big project a Beis Medrash
that they want to price stone for it
I looked at the plans
right from the beginning we saw that this is not a simple project
that we’re talking about a project that will involve a huge amount of stone
you need to understand the vision of the customer
here it was Raab Interiors,starting with Meilech and Shmiel Hersh
that explained it all in more details
from there we went on and put it down with pen and paper as we say
pen and paper by us means that we make shop drawings for it
Shop drawings is basically to understand
that the designer and the stone fabricator
which is Imperial Marble
what everyone wants and what it will look like
every detail exactly
what the designer wants and how it will look in reality once it’s installed
once the shop drawings were finalized and approved
it needed to go to the fabrication team
to make sure that they understand and know
how to cut every stone
we have here stones of all sizes
it’s not plain and regular
even high end homes
you get slabs of a certain thickness
here you’re talking about areas that are 2 inches
orr 5 inches
we had to make sure that while they cut the stones
that they know the thickness of the slab itself how to cut it
in order we should be able to produce
and make the details
that the designer had in mind
during manufacturing we had to make sure
that the puzzle comes together
and when we’ll get to the job site
we won’t have any challenges
to actually install it
once it was done
we started creating it
which means it goes into crates
and we have to make sure that no pieces break
make sure that the pieces that are in one crate
doesn’t damage the pieces when we get to the job site
the outcome from this project
every single stone, every kind of finish
should come out
every detail, that came out 100% perfect
to a ‘T’ as they say
it’s something you can't describe
it’s not something that can be explained with pen and paper what this means
my name is Shmily Ungar, and I work together with Meilech Raab
my part in this Beis Medrash was to take the design concept
And bring it to life
to figure out where every stone goes
how to make it, what to make and when to make it
pictures… sketches
we traveled all over to view historical buildings
and it ended with an actual building
it went back and forth
I sent certain drawings to Imperial
basically design drawings
of every wall, every column, every molding every door, every window
had a separate drawing
it went back and forth with comments
all the markups back and forth
it took a while but in the end it became a beautiful project
the whole idea to make everything out of stone
to figure out the architectural part of the stone
it all needed to follow actual architectural rules
it was the most tricky part
not choosing the colors and so on
it was figuring out the actual architecture of the project
the final product is probably 100% more than I expected
we envisioned this
but when I walk in I can't believe it actually happened
I got involved in this project
when Hershy and Yossi approached me
to look over the plans I saw it was a big job
I knew this would require a lot of focused energy
we sat down and went over every detail
when the shipments will arrive
when I got to the job site
every crate had a number
made sure where it had to go on the job site
and we started laying out all the stones
and every stone had a number where it has to be placed
where it needs to be installed
we BH had a big team here
we were able to have between 30 - 40 workers here every day
we got to a ratio we started doing the floors then
the floor had a specific design it needed to follow
we gave all the information to the installation team
on how to lay it out
the biggest challenge we had was how to install the columns
because the concrete wasn’t 100% straight
and how to install the Aron Kodesh, the big pieces
it’s a big accomplishment
And a very good feeling that you can
walk out of the job site
knowing that everything was done to the last detail
Making sure that all the details are how it should be
Polishing, glue, anything that needed to be fixed
the biggest success we had here was the communication
between the laborers, and our own team at Imperial Marble, and with the designers
the contractors, everyone was ready to help with anything that I needed
I want to separately thank my boss Hershy
for always being patient
Thank you Yossi, Sam Ungar, Yoeli Vizel
for always being available to help with anything I needed
anything involving the installation
they were always there to help me
my name is SImcha Rosenbaum I ran this project
coordination of everything between the contractor and all the subs
I got involved in the project when we were building the foundation
we were searching for companies that could deliver
this amount of stone, this amount of work, this amount of laborers
and of course we researched several companies
we priced it out
companies in Italy, companies in France
the only one we thought would be able to deliver it was Imperial
we’re talking about 50, 000 pieces of stone
a lot of the stones are anchors the way it is installed
there probably doesn’t exist another building like this
we coordinated things like overnight shifts
they worked in their Mexico shop, in their overseas shop
they worked a crazy amount of time to deliver it to perfection
when everything arrived it was like a puzzle
Everything went into place
we didn’t have a factory here, we couldn’t take things back
they brought here all their machinery
they cut slabs here, everything was on site
we needed to bring snow, to collect rain
because Imperial was working on the roof to install the stone
and we couldn’t make a stage to collect the rain
usually it takes 2 to 3 months to collect enough rainwater
to make sure in case there are Halachic issues
we should be able to collect it good
the only way we were able to fill it was by bringing snow to the roof
It was a daunting task
Imperial was the first to jump in to bring workers,
trucks, yungerleit that they knew that could travel
to be there 7 to 8 hours away
all Imperial, all his laborers
I want to thank him separately for this
it was a pleasure to work with them
and we’re looking forward to working with them on another project
I have many projects
buildings, here locally or in other places
this amount of work and effort
such beautiful stones and such beautiful work
should go into a Beis Medrash
it’s a special honor
especially for such a Beis Medrash
when I look at this Bimah and Aron Kodesh
the Mikvah is still at the top of my mind, and I put together these 3 things
the carvings, handcrafted
from the pillars of the Beis Medrash
the doors, and the stone that sticks out over there
in middle of the Aron Kodesh
it’s all one, I can’t separate them
I have to thank my father; I got my talent for stone from him
I used to know nothing about stone
I remember when I first started working for him all those years ago
The entire Imperial Family
and the Raab Interiors Family
Imperial Marble means Yossi Brill and all the others, it’s hard to thank everyone separately
and Raab Interiors which is of course Meilech Raab and Shmiel Hersh Ungar
that sat for days and nights
this is heart- this cannot be repaid - this is heart
then there’s Simcha Rosenbaum and Chaim Meir Fuchs from Preferred Builders
and of course, most important of all, let’s not forget R’ Yoel
that gave us the opportunity to be a part of this
it’s a zchus for our company to be a part of this
a place of torah and tefillah, where no one talks during davening
all these things that he’s built
this Beis Medrash has changed Klal Yisrael
and it will change Klal Yisrael